Facilities

CONDITIONING OF THE LAGOON SACK

Work: 1987/1988

With this action, the section between the Laguna station and the rest of the tunnel, including the refurbishment of the Lucero station, was provided with a track and overhead line.

PROGRAMMABLE AUTOMATION AND COMPLEMENTARY PROTECTION IN ELECTRICAL SUBSTATIONS OF THE MADRID METRO

Work: 1988/90

In order to minimize the service recovery time, after a disturbance in the electrical supply to the rolling stock, it was necessary to equip the substations with a series of automatic equipment that replenished the energy without intervention from the central post.

 

REMODELING OF THE SECURITY FACILITIES AND ASSISTANCE FOR THE OPERATION OF THE NEW ALUCHE STATION

Work: 1987/89

With this work, the security installations were adapted to the new distribution and operation of the Aluche Exchange Station.